An adaptable, top-performing, biological insecticide for the effective population reduction of target pests ensuring best quality fruit and vegetables.
Label | |
---|---|
Safety Data Sheet | |
Downloads |
Name | BroadBand® |
---|---|
Formulation | Emulsifiable Concentrate. |
Ingredients | Minimum 4e9 Viable spores per millilitre Beauveria bassiana strain PPRI 5339 |
Registration Number | L8270 |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). | Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at the first sign of thrips pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). | Apply at first sign of Diamondback Moth pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). | Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. Up to 80% reduction can be expected after three applications in cabbage. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). | Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. Up to 80% reduction can be expected after three applications in cabbage. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
50ml BroadBand/100L water. Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Red Spider Mite pest presence.Apply minimum of three applications throughout the season in an Integrated Programme.Use appropriate spraying equipment to get good coverage to optimize efficacy. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Thrips presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant with good spreading capability for optimum efficacy) | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply a minimum of 1000 ml BroadBand per ha in 2500 litre water. If water volumes exceeds 2500 litre water, use 2000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) Increased efficacy is achieved when combined with a suitable registered pyrethroid. | Apply at first sign of Stinkbug pest presence. Minimum of three applications over the growing season. Apply in late afternoon, early evening. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Diamondback Moth presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Diamondback Moth pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). | Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. Up to 80% reduction can be expected after three applications in cabbage. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
50ml BroadBand/100L water. Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of False Codling Moth pest presence. Apply minimum of three applications throughout the season in an Integrated Programme. Use appropriate spraying equipment to get good coverage to optimize efficacy. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
50ml BroadBand/100L water. Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of False Codling Moth pest presence. Apply minimum of three applications throughout the season in an Integrated Programme. Use appropriate spraying equipment to get good coverage to optimize efficacy. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Potato Tuber Moth pest presence. Apply at 5 to 7 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha.Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. | Apply at first sign of Whitefly pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 3-5 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Whitefly presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Whitefly pest presence.Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 3-5 day intervals.High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Whitefly presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) | Apply at first sign of Whitefly pest presence.Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 3-5 day intervals.High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). | Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). | Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. | Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate | Time of application | Number of application |
---|---|---|
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) | Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy | Apply minimum of three applications throughout the season in an Integrated Programme. |
Name | BroadBand® |
---|---|
Formulation | Emulsifiable Concentrate. |
Ingredients | Minimum 4e9 Viable spores per millilitre Beauveria bassiana strain PPRI 5339 |
Registration Number | L8270 |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). |
Time of application |
Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at the first sign of thrips pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). |
Time of application |
Apply at first sign of Diamondback Moth pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). |
Time of application |
Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. Up to 80% reduction can be expected after three applications in cabbage. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). |
Time of application |
Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. Up to 80% reduction can be expected after three applications in cabbage. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
50ml BroadBand/100L water. Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Red Spider Mite pest presence.Apply minimum of three applications throughout the season in an Integrated Programme.Use appropriate spraying equipment to get good coverage to optimize efficacy. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Thrips presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant with good spreading capability for optimum efficacy) |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply a minimum of 1000 ml BroadBand per ha in 2500 litre water. If water volumes exceeds 2500 litre water, use 2000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) Increased efficacy is achieved when combined with a suitable registered pyrethroid. |
Time of application |
Apply at first sign of Stinkbug pest presence. Minimum of three applications over the growing season. Apply in late afternoon, early evening. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Diamondback Moth presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Diamondback Moth pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of diamond back moth presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant, for optimum efficacy). |
Time of application |
Apply at the first sign of diamond back moth pest presence. Low pest pressure: Apply the lower rate (500 ml/ha), at the first sign of the pest presence and apply at 5 – 7 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. Up to 80% reduction can be expected after three applications in cabbage. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
50ml BroadBand/100L water. Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of False Codling Moth pest presence. Apply minimum of three applications throughout the season in an Integrated Programme. Use appropriate spraying equipment to get good coverage to optimize efficacy. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
50ml BroadBand/100L water. Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of False Codling Moth pest presence. Apply minimum of three applications throughout the season in an Integrated Programme. Use appropriate spraying equipment to get good coverage to optimize efficacy. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Potato Tuber Moth pest presence. Apply at 5 to 7 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha.Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. |
Time of application |
Apply at first sign of Whitefly pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 3-5 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Whitefly presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Whitefly pest presence.Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 3-5 day intervals.High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Mite presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Red Spider Mite pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500ml BroadBand per ha at first sign of Whitefly presence. High pest pressure: Apply a minimum of 1000 ml BroadBand per ha. Spray sufficient BroadBand / water mixture to obtain full crop coverage, but not to the point of run off. (Add approved adjuvant for optimum efficacy) |
Time of application |
Apply at first sign of Whitefly pest presence.Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 3-5 day intervals.High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of whitefly presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy). |
Time of application |
Apply at the first sign of whitefly pest presence. Low pest pressure: Apply the lower rate (500 ml/ha) at the first sign of pest presence and apply at 3 – 5 day intervals. High pest pressure: Apply the higher rate (1000 ml/ha) and at 3 – 5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Low pest pressure: Apply a minimum of 500 ml Broadband®/ha at the first sign of thrips presence. High pest pressure: Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband® / water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant with good spreading capability, for optimum efficacy). |
Time of application |
Apply at first sign of Thrips pest presence. Low pest pressure: Apply lower rate (500 ml/ha) at first sign of pest presence and apply at 5-7 day intervals. High pest pressure: Apply higher rate (1000 ml/ha) and at 3-5 day intervals. |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
Recommended rate |
Apply 50 ml Broadband®/100 l water. Apply a minimum of 1000 ml Broadband®/ha. Spray sufficient Broadband®/water mixture to obtain full crop coverage, but not to the point of run off. (Add an approved adjuvant for optimum efficacy) |
Time of application |
Apply at the first sign of false codling moth pest presence. Apply a minimum of three applications throughout the season, in an integrated programme. Use appropriate spraying equipment, to get good coverage, to optimize efficacy |
Number of application |
Apply minimum of three applications throughout the season in an Integrated Programme. |
To effectively reduce the population of target insects on crops you need an insecticide with high efficacy, that can be used at any time in the spray program. Broadband®, a biological insecticide, provides farmers this advantage as an alternative solution.
Broadband® is the ideal biological insecticide to effectively reduce target insect populations in a sustainable insect management programme.